LEADER Ilia Olympia
- Status
- Active
- Opening
- 25-11-2026
- Deadline
- 25-02-2027
- Subsidy
- 60%–100%
- Investment
- +2.161.000 €
The program
The LEADER Ilia Olympia program funds private investments in agricultural and non-agricultural processing, tourism, craft, services and energy/water efficiency, as well as cooperation schemes among local bodies, within the area of the Ilia Olympia Local Program. The grant ranges from 60% to 100% depending on the sub-measure, with a total budget of €2.16 million, and applications are accepted from November 25, 2026 to February 25, 2027.
The program is aimed at individuals, existing or newly formed businesses, private bodies and local public-sector bodies operating or about to operate in the intervention area, which covers most of the Regional Unit of Ilia, except the urban-plan zones of the municipal communities of Pyrgos and Amaliada. Depending on the sub-measure, funding can cover investments in buildings and equipment, studies, certifications, and actions to establish and run cooperation schemes.
Each sub-measure has its own scope, grant rate and maximum budget: from the processing of agricultural and non-agricultural products to tourism, craft, services, and cooperation among small businesses or local bodies. The program is co-financed by the European Agricultural Fund for Rural Development and implemented by Anaptixiaki Olympias AAE OTA as the Local Action Group.
At a glance
| Status | Active |
|---|---|
| Subsidy | 60%–100% depending on the sub-measure, business size and region |
| Project budget | up to €400,000 (up to €20,000 for intangible projects) |
| Own contribution | the difference between the public grant and the total project budget |
| Beneficiaries | individuals, businesses and local bodies operating in the intervention area |
| Region | Regional Unit of Ilia, excluding the urban-plan zones of Pyrgos and Amaliada |
| Applications | November 25, 2026, 1:00 p.m. – February 25, 2027, 3:00 p.m. |
| Evaluation | comparative |
How applications are evaluated
Evaluation is comparative: all applications submitted within the deadline are assessed together and ranked by score, per sub-measure. Each proposal must meet every eligibility criterion and score above the minimum threshold set by the call to be admissible. In case of a tie, the proposal with the higher score on the criterion (or criteria) carrying the greatest weight ranks higher. Because evaluation is comparative rather than first-come, first-served, the submission date does not affect ranking, as long as the application is filed on time.
Before inclusion, a pre-inclusion check verifies compliance with the de minimis aid accumulation ceiling. Applicants have the right to file an objection within 10 calendar days of the electronic notification of the evaluation result, which is examined by the Objections Committee within 15 working days.
Duration and obligations
The date the electronic inclusion notice is sent marks the start of the investment's implementation period. The beneficiary must submit a payment request for at least 15% of the total public expenditure of the project within 18 months of the inclusion decision, otherwise the inclusion is revoked. An advance payment of up to 50% of the approved public aid still owed for completion of the project can be requested.
After completion, the beneficiary keeps long-term obligations for 3 years for SMEs, or for 5 years from the last payment for tourist accommodation investments, infrastructure projects, or projects on leased property. During this period, the activity may not cease or relocate outside the area, ownership changes that confer an unjustified advantage are not allowed, and no substantial change may undermine the original objectives. All supporting documents must be kept for at least 10 years after the last payment of the aid.
Call details: Intervention P3-77-4.1 "Support for local development through LEADER" · Common Agricultural Policy Strategic Plan (CAP SP) 2023-2027 · Call Ref. No. 191/November 16, 2026 · Joint Decision 161876/June 22, 2026 (Government Gazette B' 4030)
Who it is for
KAD codes excluded
For the sub-measures supported under the de minimis aid regime, every activity is eligible except crop and animal production and fishing/aquaculture, with the exception of certain agricultural support services (such as drying, sorting and packaging of agricultural products) that remain eligible.
KAD 01: Crop and animal production, hunting and related service activities
01
KAD 03: Fishing and aquaculture
03
Eligibility conditions
- Beneficiaries can be individuals, existing or newly formed legal entities, private bodies whose statutory purpose matches the project, and local public-sector bodies or local associations/organizations.
- For entities under formation, a draft statute and a tax ID (AFM) held by at least one participating member, with the written consent of the others, is required.
- For the cooperation sub-measures (P3-77-4.1-7.1, 7.2, 7.3) the beneficiary is a scheme of at least three bodies; in 7.1 formal business entities based within the intervention area are required, while 7.2 and 7.3 also allow informal schemes with a cooperation agreement.
- For tourist accommodation investments a building permit is required, and the investment must be located in mountainous areas or on islands with a population under 3,500 residents (this restriction does not apply to camping facilities).
- The investment must be carried out within the geographic intervention area of the Ilia Olympia Local Program, as set out in the call's table, excluding the urban-plan zones of Pyrgos and Amaliada.
- For sub-measures under the de minimis aid regime, the total de minimis aid received by the single undertaking must not exceed €300,000 over any rolling three-year period.
- The own contribution can be covered with own funds and/or a loan, and can be evidenced by a sworn statement, a bank document, or proof of holding a readily liquid security.
Who is excluded
- Offshore companies.
- Entities with final labor-law fines for high or very high severity violations (3 fines/3 inspections) or undeclared work (2 fines/2 inspections).
- Public employees or staff of public-law or private-law legal entities without the relevant permit from the competent service council.
- Individuals or legal entities under dissolution, liquidation or bankruptcy proceedings.
- Individuals under 18 years of age, except for SAs, limited liability companies, private companies (IKE) and cooperatives.
- New slaughterhouses, except for slaughterhouses up to 400 tons of meat/year on island areas and poultry slaughterhouses in mountainous or island areas.
- New olive mills, except for the modernization and resumption of operation of olive mills that have ceased operating.
Program budget
The total public expenditure of the call amounts to an indicative €2,161,000, allocated among sub-measures as follows:
| Sub-measure | Budget |
|---|---|
| P3-77-4.1-1.1 Processing of agricultural products | €766,000 |
| P3-77-4.1-1.2 Processing of non-agricultural products | €100,000 |
| P3-77-4.1-1.4 Craft, handicraft, post-primary processing | €130,000 |
| P3-77-4.1-1.5 Tourism sector | €805,000 |
| P3-77-4.1-1.6 Services | €85,000 |
| P3-77-4.1-1.7 Energy/water saving, circular economy | €215,000 |
| P3-77-4.1-7.1 Cooperation among small businesses | €20,000 |
| P3-77-4.1-7.2 Cooperation among local bodies | €20,000 |
| P3-77-4.1-7.3 Smart Villages | €20,000 |
The Local Action Group, with the agreement of the competent authority, may update the total amount or its allocation among sub-measures, or justifiably withdraw the call, informing potential beneficiaries through its website.
Subsidy amount
The maximum eligible project budget varies by sub-measure: up to €400,000 (or €20,000 for intangible actions) for the processing of agricultural products, and up to €300,000 (or €20,000 for intangible actions) for the other private-sector sub-measures. For the cooperation sub-measures, the budget is set based on a simplified-cost study.
The grant rate varies significantly by sub-measure, business size and investment region:
| Sub-measure | Size/Region | Rate |
|---|---|---|
| 1.1 Processing of agricultural products | All regions | 65% (80% for category 4aiii investments) |
| 1.2 Processing of non-agricultural products | All regions | up to 65% |
| 1.4, 1.5, 1.6 | Micro/small, North Aegean | 75% |
| 1.4, 1.5, 1.6 | Medium/large, North Aegean | 70% |
| 1.4, 1.5, 1.6 | Micro/small, Western Greece and other listed regions | 65% |
| 1.4, 1.5, 1.6 | Medium/large, same regions | 60% |
| 1.4, 1.5, 1.6 | Central Greece, Ionian Islands, South Aegean, etc. | 60% (all sizes) |
| 1.7 Energy/water saving | All regions | 80% |
| 7.1 Cooperation among small businesses | — | 90% |
| 7.2 Cooperation among local bodies | — | 100% |
| 7.3 Smart Villages | — | 100% |
The own contribution equals the total project budget minus the public grant. For example, for a €200,000 project under sub-measure 1.1 at a 65% rate, the public grant is €130,000 and the own contribution is €70,000.
For the sub-measures under the de minimis aid regime, the total de minimis aid received by the single undertaking cannot exceed €300,000 over any rolling three-year period. An advance payment of up to 50% of the approved public aid still owed for completion of the project can be requested.
Eligible expenses
Eligible expenses vary by sub-measure, but generally fall into the following categories:
| Expense category | What it covers |
|---|---|
| Land/property purchase | Purchase of a plot or building for the investment |
| Buildings and surroundings | Construction or improvement of buildings, landscaping, utility connections within the plot |
| Equipment | Purchase, transport and installation of production, mechanical or specialized equipment, including renewable energy and water-saving equipment |
| Intangible items | Software, patents, licenses, trademarks, quality certificates, market studies |
| Promotion | Website, printed material, participation in exhibitions |
| General expenses | Fees for architects, engineers, consultants, technical support for implementation |
| Flat-rate cooperation costs (sub-measures 7.1-7.3) | Formation of the cooperation scheme and preparation of the action plan, per the Simplified Cost Guide |
The eligibility period for expenses starts on January 1, 2023.
Ineligible expenses
- Leasing of building facilities.
- Simple maintenance of buildings or mechanical equipment.
- Temporary works not directly linked to the project.
- Annual fees, charges, interest, insurance for third parties.
- Finance lease contracts, working capital.
- Purchase of used vehicles or used equipment.
- Purchase of vehicles, with exceptions for specially adapted vehicles for social/environmental purposes or vehicles necessary for the investment's operation, up to 30% of the requested budget.
- Operating expenses and consumables.
- VAT, unless it is non-recoverable.
- Expenses already financed by another program.
- Expenses to comply with mandatory requirements in modernization cases.
- Staff wages for running the business.
- Simple replacement of equipment not yet depreciated.
- Road works outside the boundaries of the plot.
- Promotion and advertising on social media.
Important dates
- 11/16/2026 — Publication of the call (Ref. No. 191)
- 11/25/2026, 1:00 p.m. — Start of application submission
- 2/25/2027, 3:00 p.m. — Deadline for application submission
Frequently asked questions about LEADER Ilia Olympia
Who can apply for support?
Individuals, existing or newly formed businesses, private bodies and local public-sector bodies operating or about to operate within the intervention area of the Ilia Olympia Local Program.
Does the order of submission affect inclusion?
No. Evaluation is comparative, not first-come, first-served; all timely applications are ranked together by score after the submission deadline closes.
From when are expenses eligible?
The eligibility period for expenses starts on January 1, 2023. Projects whose physical work was already completed before the application was submitted are not eligible.
What if the business has received de minimis aid before?
The total de minimis aid received by the single undertaking, including the aid requested from this call, must not exceed €300,000 over any rolling three-year period. An accumulation check is run through the National De Minimis Aid Registry before inclusion.
Can an advance payment be requested?
Yes, the beneficiary can submit one or more advance payment requests, up to a total of 50% of the approved public aid still owed for completion of the project.
Is there a limit on applications per business?
Only one application is allowed per tax ID (AFM) per sub-measure within the same call; submitting more than one leads to the rejection of all related applications.
Useful files
Interested in this program?
The espa.io team prepares and submits the application. Book an appointment with an adviser, or send an email to info@espa.io.
Book your free consultation
Leave your details and we will call you about this program. In a 15-minute call we will see together whether it suits your business.