{"id":29719,"date":"2023-08-25T23:04:12","date_gmt":"2023-08-25T23:04:12","guid":{"rendered":"https:\/\/espa.io\/photovoltaics-on-the-roof-platform-available-for-applications\/"},"modified":"2023-08-25T23:04:12","modified_gmt":"2023-08-25T23:04:12","slug":"photovoltaics-on-the-roof-platform-available-for-applications","status":"publish","type":"post","link":"https:\/\/espa.io\/en\/photovoltaics-on-the-roof-platform-available-for-applications\/","title":{"rendered":"Photovoltaics on the roof: Platform available for applications"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/espa.io\/wp-content\/uploads\/2023\/08\/fotovoltaika-sti-stegi-diathesimi-i-platforma-gia-tis-aitiseis-1024x576.jpg\" alt=\"\"\/><\/figure>\n\n<p>The ability of <strong>thousands of households and <a href=\"https:\/\/espa.io\/en\/c\/farming-sector\/\" target=\"_blank\" rel=\"noreferrer noopener\">farmers<\/a><\/strong> to produce the electricity they need and save money is made possible by the <strong>Photovoltaics on the Roof<\/strong> programme (Government Gazette 2903\/B\/02-05-2023) with a total budget of <strong>238 million euros<\/strong>, the platform of which (<a href=\"https:\/\/pvstegi.gov.gr\" target=\"_blank\" rel=\"noopener\">\n  <strong>https:\/\/pvstegi.gov.gr<\/strong>\n<\/a>) available from <strong>Tuesday 2 May<\/strong>.<\/p>\n\n<p><strong>Beneficiaries of the Programme are households and farmers who will be able to install their own small photovoltaic system, combined with a storage system (battery)<\/strong>. \u0397  <strong>subsidy of<\/strong> the photovoltaic system starts  <strong>from 45% to 75% for households<\/strong>. The corresponding rates for  <strong>farmers<\/strong> are  <strong>40% &#8211; 60%<\/strong>, while the <strong>total subsidy<\/strong> of the photovoltaic system with battery can reach <strong>up to 16,000 euros<\/strong> for <strong>households<\/strong> and<strong>10,000 euros for farmers<\/strong>.<\/p>\n\n<p>At the same time, a <strong>special <\/strong><strong> 10%<\/strong><strong>bonus<\/strong> is provided for people with disabilities, spouses and dependants of people with disabilities, single-parent, three-parent and large families.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-&#x3B7;-&#x3C5;&#x3C0;&#x3BF;&#x3B2;&#x3BF;&#x3BB;&#x3AE;-&#x3C4;&#x3C9;&#x3BD;-&#x3B1;&#x3B9;&#x3C4;&#x3AE;&#x3C3;&#x3B5;&#x3C9;&#x3BD;\"><strong>The submission of applications<\/strong><\/h2>\n\n<p><strong>The submission of applications and their approval is immediate, fast and automated<\/strong>, without hassle and complicated bureaucracy, through the online platform of the <strong>\n  <a href=\"https:\/\/deddie.gr\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">DEDDIE<\/a>\n<\/strong> and the use of <strong>TAXISNET codes<\/strong>. <strong>The application system will remain open until the available resources are exhausted, with a deadline of the end of June 2024.<\/strong><\/p>\n\n<p><strong>Each natural person may submit only one application<\/strong>, for a single dwelling, primary or secondary, which has an active domestic electricity supply. <strong>Farmers may submit more than one application<\/strong>, depending on the number of agricultural electricity providers they have. <strong>They may also submit an application for their residence<\/strong>.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-&#x3C6;&#x3C9;&#x3C4;&#x3BF;&#x3B2;&#x3BF;&#x3BB;&#x3C4;&#x3B1;&#x3CA;&#x3BA;&#x3AC;-&#x3C3;&#x3C4;&#x3B7;-&#x3C3;&#x3C4;&#x3AD;&#x3B3;&#x3B7;-&#x3C0;&#x3CE;&#x3C2;-&#x3B4;&#x3B9;&#x3B1;&#x3BD;&#x3AD;&#x3BC;&#x3B5;&#x3C4;&#x3B1;&#x3B9;-&#x3BF;-&#x3C0;&#x3C1;&#x3BF;&#x3CB;&#x3C0;&#x3BF;&#x3BB;&#x3BF;&#x3B3;&#x3B9;&#x3C3;&#x3BC;&#x3CC;&#x3C2;\"><strong>Photovoltaics on the roof &#8211;<\/strong> <strong>How the budget is distributed<\/strong><\/h2>\n\n<p><strong>The total budget of the Programme is \u20ac238 million. euro.<\/strong>  It comes from the resources of the <strong>\n  <a href=\"https:\/\/www.minfin.gr\/tameio-anakampses\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Recovery and Resilience Fund<\/a>\n<\/strong> and shall be distributed as follows:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Special attention is given to vulnerable households and \u20ac45 million is earmarked exclusively for them. EUR (Category A)<\/strong><\/li>\n\n\n\n<li><strong>Exclusively for citizens with individual income &lt;= 20,000\u20ac or family income &lt;= 40,000\u20ac: 100 million. EUR (Category B)<\/strong><\/li>\n\n\n\n<li><strong>Exclusively for citizens with individual income &gt; 20,000\u20ac or family income &gt; 40,000\u20ac: 63 million. EUR (Category C)<\/strong><\/li>\n\n\n\n<li><strong>Exclusive<\/strong> <strong>for professional and special scheme farmers: 30 million EUR (Category D)<\/strong><\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading\" id=\"h-&#x3C0;&#x3C1;&#x3BF;&#x3CB;&#x3C0;&#x3BF;&#x3B8;&#x3AD;&#x3C3;&#x3B5;&#x3B9;&#x3C2;-&#x3BA;&#x3B1;&#x3B9;-&#x3C3;&#x3C4;&#x3CC;&#x3C7;&#x3BF;&#x3B9;\"><strong>Conditions and objectives<\/strong><\/h2>\n\n<p>The basic requirement for submitting an application is that <strong>the applicant must have already concluded a Connection Contract<\/strong> with the <strong>DEDDIE.<\/strong> However, <strong>the photovoltaic station must not have been connected<\/strong>.<\/p>\n\n<p>This station can be installed:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>on the roof or the roof of a building (which includes canopies, terraces, facades, shades and pergolas)<\/strong><\/li>\n\n\n\n<li><strong>in ancillary areas of the building or agricultural land (e.g. storage and parking areas); or<\/strong><\/li>\n\n\n\n<li><strong>on the ground<\/strong><\/li>\n<\/ul>\n\n<p><strong>The aim of the programme is to cover up to the full cost of the battery<\/strong> and the <strong>development and installation<\/strong> <strong>costs<\/strong> of the photovoltaic. <strong>For the first two categories, the subsidy for the battery is 100%, while for the third and fourth categories it is 90%.<\/strong><\/p>\n\n<p><strong>Households will be required to install a battery-operated photovoltaic station.<\/strong> <strong>Farmers<\/strong> are given the option to <strong>choose<\/strong> to <strong>install a photovoltaic station with or without a battery<\/strong>.<\/p>\n\n<p><strong>The maximum installed capacity of the photovoltaic station to be subsidised<\/strong> is set at <strong>10.8kW<\/strong>. Similarly, <strong>as regards the battery, the maximum subsidy is set at 10,8kWh<\/strong>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The ability of thousands of households and farmers to produce the electricity they need and save money is made possible by the Photovoltaics on the Roof programme (Government Gazette 2903\/B\/02-05-2023) with a total budget of 238 million euros, the platform of which ( https:\/\/pvstegi.gov.gr ) available from Tuesday 2 May. Beneficiaries of the Programme are [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29717,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[2295,2261,2222,2221,2529],"aid_type_posts":[2081],"activity_posts":[2013,2063,2003,2082,2083,2065,2084,2085,2052],"investment_region_posts":[2022,2018,2053,2025,2026,2023,2028,2024,2019,2030,2027,2029,2020,2021],"business_type_posts":[2032,2031],"funding_type_posts":[2039],"business_size_posts":[2034,2036],"category_of_beneficiary_posts":[2037,2043],"class_list":["post-29719","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-energy-efficiency","tag-energy-upgrade","tag-green-energy","tag-green-transition","tag-photovoltaics-on-the-roof","aid_type_posts-2081","activity_posts-agricultural-sector","activity_posts-aquaculture","activity_posts-energy","activity_posts-fishery","activity_posts-forestry-forestry","activity_posts-georgia","activity_posts-livestock-farming","activity_posts-news-farmers","activity_posts-processing-of-agricultural-products","investment_region_posts-all-of-greece","investment_region_posts-attica-en","investment_region_posts-central-greece","investment_region_posts-central-macedonia","investment_region_posts-crete","investment_region_posts-eastern-macedonia-and-thrace","investment_region_posts-epirus","investment_region_posts-ionian-islands","investment_region_posts-north-aegean","investment_region_posts-peloponnese","investment_region_posts-southern-aegean-sea","investment_region_posts-thessaly","investment_region_posts-west-greece","investment_region_posts-western-macedonia","business_type_posts-existing-businesses","business_type_posts-new-businesses","funding_type_posts-subsidy","business_size_posts-small","business_size_posts-2036","category_of_beneficiary_posts-businesses","category_of_beneficiary_posts-individuals"],"_links":{"self":[{"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/posts\/29719","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/comments?post=29719"}],"version-history":[{"count":1,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/posts\/29719\/revisions"}],"predecessor-version":[{"id":29720,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/posts\/29719\/revisions\/29720"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/media\/29717"}],"wp:attachment":[{"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/media?parent=29719"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/categories?post=29719"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/tags?post=29719"},{"taxonomy":"aid_type_posts","embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/aid_type_posts?post=29719"},{"taxonomy":"activity_posts","embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/activity_posts?post=29719"},{"taxonomy":"investment_region_posts","embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/investment_region_posts?post=29719"},{"taxonomy":"business_type_posts","embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/business_type_posts?post=29719"},{"taxonomy":"funding_type_posts","embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/funding_type_posts?post=29719"},{"taxonomy":"business_size_posts","embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/business_size_posts?post=29719"},{"taxonomy":"category_of_beneficiary_posts","embeddable":true,"href":"https:\/\/espa.io\/en\/wp-json\/wp\/v2\/category_of_beneficiary_posts?post=29719"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}